Integrates with & replaces
PC
Procore
PG
PlanGrid
BB
Bluebeam
RS
RSMeans
BT
BuilderTrend
AD
Autodesk BIM
CC
CoConstruct
FW
Fieldwire
PC
Procore
PG
PlanGrid
BB
Bluebeam
RS
RSMeans
BT
BuilderTrend
AD
Autodesk BIM
CC
CoConstruct
FW
Fieldwire
Construction Knowledge BaseIRC · IBC · RSMeans · OSHA · ACI · AISC

One search. Every spec, code, and method — explained like your best PM would.

Pull up the right answer before the inspector arrives. No tab-hopping, no paywalled PDFs, no guessing. Scaffold cites every answer to the exact code section.

14,200+
Code sections indexed
0.4s
Avg. answer time
38
Reference sources
99.1%
Citation accuracy

What's actually indexed

Hover any row to see the exact code reference. Every answer links back to its source.

Feature / CoverageScaffold★ BestProcoreBluebeamRSMeans
IRC residential code lookups?IRC 2021 §R403.1 — Footings
✓———
IBC commercial code references?IBC 2021 §1604.3 — Load combos
✓———
RSMeans cost data integration?RSMeans 2024 — Division 03
✓——✓
OSHA 1926 safety standards?OSHA 1926.502 — Fall protection
✓———
ACI 318 concrete design?ACI 318-19 §9.6 — Rebar spacing
✓———
AISC steel connection specs?AISC 360-22 §J2 — Weld design
✓———
Submittal log cross-reference?Links spec sections to submittals
✓✓——
Plain-language method explanations?No jargon — field-ready answers
✓———
Try a Search Free →

Time-to-answer benchmark

Measured from query to cited answer. Tested on 200 real field queries, Jan 2026.

Time-to-cited-answer (lower = better)

Scaffold★0.4s
Google + PDF4.2min
Procore Search2.8min
Bluebeam Revu6.1min
RSMeans Online3.5min
0.4s
Median answer time
vs 3.9 min industry avg
580×
Faster than manual lookup
On a cracked iPad at the site
< 1s
Cold-start query time
No account required
24/7
Available offline
PWA cache for field use

Ask Scaffold anything

Real answers, real citations. No account required.

Free searches. No credit card. No account required to start.

See Plans →

Every answer has a return address

99.1% citation accuracy across 14,200 indexed sections. Independently verified Q4 2025.

99.1%
Citation accuracy

Every Scaffold answer links to its exact code section, edition, and clause. Our legal team audits 500 random answers per month against primary sources. When a code updates (IRC 2024 ships Q3 2026), every affected answer is re-verified within 48 hours.

IRC 2021 §R403.1✓ Verified

Footing depth below frost line

Minimum 12" below undisturbed ground; must extend below frost depth per Table R301.2(1)

ACI 318-19 §9.6.1.2✓ Verified

Min. flexural reinforcement ratio

ρ_min = 3√f'c / fy ≥ 200/fy for non-prestressed beams

OSHA 1926.502(d)✓ Verified

Personal fall arrest system

Must limit max arresting force to 1,800 lbs; deceleration distance ≤ 3.5 ft

IBC 2021 §1604.3✓ Verified

Load combinations — basic

D + L; D + L + (Lr or S or R); D + L + W; etc. — LRFD and ASD provided

AISC 360-22 §J2.4✓ Verified

Fillet weld minimum size

Based on thicker part joined: ≤¼" → 1/8"; ¼"–½" → 3/16"; ½"–¾" → ¼"

ASTM C94 §11.8✓ Verified

Ready-mix concrete discharge limit

Discharge must be completed within 90 minutes or 300 revolutions after water introduction

Scaffold cites 38 primary sources — IRC, IBC, ACI, AISC, OSHA, ASTM, RSMeans, and more.

Try a Search Free →

Works inside the tools you already use

Scaffold answers live inside Procore, PlanGrid, Bluebeam — no context switching.

PC

Procore

Project Management

Deep
PG

PlanGrid

Field Drawings

Deep
BB

Bluebeam Revu

PDF Markup

Medium
RS

RSMeans

Cost Data

Deep
BT

BuilderTrend

Home Building

Medium
AD

Autodesk BIM 360

BIM/CAD

Deep
FW

Fieldwire

Task Management

Medium
CC

CoConstruct

Custom Builders

Light
Deep integrationMedium integrationLight integration

What Scaffold enables

WorkflowScaffoldManual
Pull submittal log from Procore✓—
Link spec section to PlanGrid sheet✓—
Annotate Bluebeam PDF with Scaffold answer✓—
Cross-ref RSMeans cost to spec requirement✓—
Push RFI answer to Procore RFI log✓—
Export citations as CSV for closeout docs✓—

New integrations ship monthly. Request your tool at integrations@scaffold.build

Try a Search Free →

No surprises. No per-query billing.

Procore costs $375+/seat/month. Scaffold costs $49. Both answer RFIs. Only one cites the code.

Field

$0/month

For individual use on-site

✓20 searches/day
✓IRC & IBC code lookup
✓Citation links
✓Mobile / iPad optimized
—RSMeans cost data
—Procore integration
—Team search history
—Custom spec library
Start Free
★ Most Used

Project

$49/mo per seat

For PMs juggling 3+ jobs

✓Unlimited searches
✓All 38 code sources
✓RSMeans cost cross-ref
✓Procore + PlanGrid API
✓Submittal log linking
✓Team search history
✓RFI answer export
—Custom spec library
Try 14 Days Free

Office

$199/mo (up to 20 seats)

For estimating & engineering teams

✓Everything in Project
✓Custom spec library upload
✓SSO / SAML
✓Priority support (2hr SLA)
✓API access
✓Audit log & permissions
✓Dedicated onboarding
✓Custom integrations
Talk to Sales

See Full Comparison PDF

Scaffold vs Procore vs Bluebeam vs RSMeans — 47 features, side by side.

Try a Search Free — No Card Required

Free plan available forever. Upgrade anytime.